{"id":925,"date":"2026-07-22T08:30:23","date_gmt":"2026-07-22T08:30:23","guid":{"rendered":"https:\/\/yuxi-tirerecycling.com\/uncategorized\/is-a-tire-debeader-worth-it\/"},"modified":"2026-07-22T08:30:23","modified_gmt":"2026-07-22T08:30:23","slug":"is-a-tire-debeader-worth-it","status":"publish","type":"post","link":"https:\/\/yuxi-tirerecycling.com\/es\/blog\/is-a-tire-debeader-worth-it\/","title":{"rendered":"Is a Tire Debeader Worth It? ROI Guide"},"content":{"rendered":"<div class=\"yuxi-content\">\n<div class=\"hero\">\n<div class=\"wrap hero-grid\">\n<div>\n      <span class=\"eyebrow\">Investment decision and payback method<\/span><\/p>\n<div class=\"dek\">Only when the reduction in labor,downstream wear,downtime or steel processing costs is greater than the installation and operation costs of the new pretreatment steps,it is worth buying a bead removal machine.<\/div>\n<\/p><\/div>\n<figure>\n      <img src=\"https:\/\/yuxi-tirerecycling.com\/wp-content\/uploads\/2026\/07\/is-a-tire-debeader-worth-it-hero.webp\" width=\"1600\" height=\"900\" loading=\"eager\" fetchpriority=\"high\" decoding=\"async\" alt=\"Is a tire debeader worth it cost labor and blade wear ROI guide\" title=\"Is a Tire Debeader Worth It?\"><figcaption>The useful payback calculation begins with the current work cell, not with a generic machine price or a best-case pulling video.<\/figcaption><\/figure>\n<\/p><\/div>\n<\/div>\n<article>\n<div class=\"wrap\">\n<div class=\"lead\">A factory manager regards the tire remover as an additional control.Another person thinks this is the cheapest way to stop sending concentrated bead bundles into expensive shredders.Both may be correct.The answer varies with the tire mixture,the prepared feed,the annual output,the current labor method,the history of downstream blades,the value of steel,and the quality required for the next process.<\/div>\n<div class=\"para\">That is why \u201cHow fast is the machine?\u201d is not the first ROI question. In practice, we start with a much less exciting exercise: pull twelve months of maintenance records, time the complete current route, mark every bead-related stop and then test the same tire family through the proposed work cell. The spreadsheet usually becomes clearer after that.<\/div>\n<div class=\"good\">\n<div class=\"para\"><strong>Respuesta r\u00e1pida:<\/strong> A tire debeader is more likely to be worth it when the project has a steady volume of compatible prepared bead rings, expensive downstream cutters, recurring bead-wire wrapping or chipping, high loaded labor cost, or a real need for cleaner rubber feed. It is less likely to pay back when volume is low, feed preparation is inconsistent, no bead-related cost has been measured, or the machine simply adds a disconnected step in front of an already balanced line.<\/div>\n<\/div>\n<nav class=\"toc\" aria-label=\"\u00cdndice\">\n<h2>En esta gu\u00eda<\/h2>\n<ol>\n<li><a href=\"#worth-it\">When the answer is usually yes<\/a><\/li>\n<li><a href=\"#value-streams\">Five ROI value streams<\/a><\/li>\n<li><a href=\"#baseline\">Build the current-route baseline<\/a><\/li>\n<li><a href=\"#installed-cost\">Calculate installed project cost<\/a><\/li>\n<li><a href=\"#labor\">Measure labor correctly<\/a><\/li>\n<li><a href=\"#wear\">Value blade wear and downtime<\/a><\/li>\n<li><a href=\"#steel-quality\">Steel and output-quality value<\/a><\/li>\n<li><a href=\"#formulas\">ROI, payback and break-even formulas<\/a><\/li>\n<li><a href=\"#example\">Illustrative payback example<\/a><\/li>\n<li><a href=\"#not-worth-it\">When it may not be worth it<\/a><\/li>\n<li><a href=\"#trial\">Run a representative-tire trial<\/a><\/li>\n<li><a href=\"#yuxi-fit\">Where the YUXI machine fits<\/a><\/li>\n<li><a href=\"#safety\">Safety and cost boundaries<\/a><\/li>\n<li><a href=\"#decision\">Final decision matrix<\/a><\/li>\n<li><a href=\"#faq\">PREGUNTAS FRECUENTES<\/a><\/li>\n<\/ol>\n<\/nav>\n<div id=\"worth-it\">\n<h2>1. When Is a Tire Debeader Usually Worth Considering?<\/h2>\n<div class=\"para\">The strongest cases usually begin with a visible constraint. A plant is not buying the machine because bead wire exists; every radial tire already contains a bead. It is buying because the concentrated bead package is creating a cost somewhere else.<\/div>\n<div class=\"grid-2\">\n<div class=\"card\">\n<h3>Downstream cutters are expensive to stop<\/h3>\n<div class=\"para\">A bead-related jam that lasts ten minutes in an isolated shredder is different from the same stop in a balanced line where conveyors, screens and downstream granulation all wait. The value of the avoided stop rises with the number of dependent processes.<\/div>\n<\/div>\n<div class=\"card\">\n<h3>The current front-end method is labor-heavy<\/h3>\n<div class=\"para\">A hydraulic extraction cycle may replace repeated turning, cutting, pulling or rework. That does not guarantee one-person operation, but it creates a measurable labor comparison.<\/div>\n<\/div>\n<div class=\"card\">\n<h3>Truck or bus rings dominate the mix<\/h3>\n<div class=\"para\">Heavy radial rings can place a concentrated, difficult load into the next machine. The financial case becomes stronger when the hard tire family is ordinary production rather than an occasional exception.<\/div>\n<\/div>\n<div class=\"card\">\n<h3>Cleaner feed has commercial value<\/h3>\n<div class=\"para\">A buyer producing granules or powder may value early removal because the downstream process must ultimately separate steel and fabric from rubber. The benefit must still be tied to accepted output, rework or separation cost.<\/div>\n<\/div>\n<\/div>\n<div class=\"para\">The EPA\/USTMA scrap-tire handbook defines debeading as removal of the heavy bead reinforcing wire and states that removal before shredding allows a cleaner end product and less wear on moving shredder parts.<sup><a href=\"#ref-handbook\">2<\/a><\/sup> That is a sound engineering direction. It is not a dollar amount. The plant still has to translate \u201cless wear\u201d into its own blade, service and downtime history.<\/div>\n<\/div>\n<div id=\"value-streams\">\n<h2>2. The Five Value Streams Behind Tire Debeader ROI<\/h2>\n<figure>\n<img src=\"https:\/\/yuxi-tirerecycling.com\/wp-content\/uploads\/2026\/07\/tire-debeader-roi-value-bridge.webp\" width=\"1600\" height=\"900\" loading=\"lazy\" decoding=\"async\" alt=\"Five value streams in a tire debeader ROI model including labor blade wear downtime steel and output quality\" title=\"Tire Debeader ROI Value Bridge\"><figcaption>ROI normally comes from several modest improvements. A credible calculation subtracts the new machine\u2019s power, maintenance, handling and spare-part cost.<\/figcaption><\/figure>\n<table>\n<thead>\n<tr>\n<th>Value stream<\/th>\n<th>What to measure<\/th>\n<th>Common overstatement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Labor change<\/td>\n<td>Operator count \u00d7 complete-process labor-minutes \u00d7 loaded labor rate.<\/td>\n<td>Timing only the hydraulic pull and ignoring ring preparation, staging, release and wire collection.<\/td>\n<\/tr>\n<tr>\n<td>Avoided blade or cutter wear<\/td>\n<td>Parts, sharpening, service labor and normalized life across comparable tire mix and tonnage.<\/td>\n<td>Assuming every blade replacement was caused by bead wire.<\/td>\n<\/tr>\n<tr>\n<td>Avoided downtime<\/td>\n<td>Bead-related stops \u00d7 average duration \u00d7 defensible value of a constrained production hour.<\/td>\n<td>Multiplying downtime by gross annual sales.<\/td>\n<\/tr>\n<tr>\n<td>Recovered bead steel<\/td>\n<td>Net saleable mass \u00d7 local realized price, less contamination and handling.<\/td>\n<td>Using a headline scrap price without deductions or assuming all tire steel is removed.<\/td>\n<\/tr>\n<tr>\n<td>Output or throughput contribution<\/td>\n<td>Accepted output, rework, downstream separation load or additional saleable production.<\/td>\n<td>Counting rated capacity that the rest of the line cannot use.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"formula\"><code>Annual net benefit = labor benefit + avoided wear + avoided downtime + net steel contribution + usable throughput\/quality contribution \u2212 added operating and maintenance cost<\/code><\/div>\n<div class=\"para\">Notice that the formula permits a negative labor benefit. In plants that currently send bead-containing material directly to the shredder, a debeader introduces loading and extraction work at the front end. The machine may still be worthwhile, but the return must then come from wear, stoppages, material quality or downstream productivity rather than a fictional labor saving.<\/div>\n<\/div>\n<div id=\"baseline\">\n<h2>3. Build the Current-Route Baseline Before Pricing the Machine<\/h2>\n<div class=\"para\">A good ROI study has two routes: what the plant does now and what it proposes to do after installation. Comparing the new machine with \u201cnothing\u201d hides the real process difference.<\/div>\n<figure>\n<img src=\"https:\/\/yuxi-tirerecycling.com\/wp-content\/uploads\/2026\/07\/tire-debeader-baseline-vs-proposed-workflow.webp\" width=\"1600\" height=\"900\" loading=\"lazy\" decoding=\"async\" alt=\"Baseline versus proposed tire recycling workflow with and without a tire debeader\" title=\"Tire Debeader Baseline vs Proposed Workflow\"><figcaption>Use the same tire mix, cycle boundary and accepted output definition for both routes.<\/figcaption><\/figure>\n<h3>Baseline A: the plant already removes bead wire<\/h3>\n<div class=\"para\">The machine is replacing a manual, semi-mechanical or older extraction method. Here the main comparison is labor-minutes, accepted extraction rate, rework, handling, safety exposure and maintenance. We have found this to be the easiest case to model because both routes create similar outputs.<\/div>\n<h3>Baseline B: the plant sends the bead section into the shredder<\/h3>\n<div class=\"para\">The new machine adds a pretreatment stage. Labor may increase. The plant must document what it expects to avoid downstream: chipped edges, unusual cutter replacement, wire wrapping, clearing stops, lower production rate on heavy tire days or extra steel-separation work.<\/div>\n<h3>Baseline C: the plant outsources or sells tires in a different form<\/h3>\n<div class=\"para\">The financial question is broader. The machine may enable a new internal process or product, but then the model must include the complete downstream equipment and market assumptions. A debeader alone does not turn a collection yard into a profitable crumb-rubber plant.<\/div>\n<div class=\"bluebox\">\n<div class=\"para\"><strong>Baseline rule:<\/strong> use at least four weeks of representative operating data, and longer when tire mix or blade replacement is seasonal. One bad shift is not a maintenance baseline. One clean demonstration is not a production baseline.<\/div>\n<\/div>\n<\/div>\n<div id=\"installed-cost\">\n<h2>4. Calculate Total Installed Cost, Not the Catalog Number<\/h2>\n<div class=\"para\">The investment side of the equation should include every cost required to make the cell productive. The dedicated <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/tire-debeader-machine-price\/\" target=\"_blank\">Gu\u00eda de precios y solicitudes de presupuesto para m\u00e1quinas de desmontado de neum\u00e1ticos<\/a> covers quotation normalization and delivery scope in detail. For ROI, bring those items into one installed-cost number.<\/div>\n<table>\n<thead>\n<tr>\n<th>Cost group<\/th>\n<th>Possible items<\/th>\n<th>ROI treatment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Equipamiento<\/td>\n<td>Machine, approved hook configuration, guards, controls, hydraulic unit, tools and initial spares.<\/td>\n<td>One-time capital cost unless an item is expected to repeat frequently.<\/td>\n<\/tr>\n<tr>\n<td>Logistics<\/td>\n<td>Packing, freight, insurance, duties, customs, inland delivery and unloading.<\/td>\n<td>Include in installed project cost, not as an afterthought.<\/td>\n<\/tr>\n<tr>\n<td>Site readiness<\/td>\n<td>Foundation or anchors, electrical work, lighting, barriers, oil, access and material staging.<\/td>\n<td>Include one-time implementation cost.<\/td>\n<\/tr>\n<tr>\n<td>Manipulaci\u00f3n<\/td>\n<td>Lift table, hoist, roller support, bins or carts for rings and spring-like wire bundles.<\/td>\n<td>Include when required to achieve the proposed labor and safety method.<\/td>\n<\/tr>\n<tr>\n<td>Start-up<\/td>\n<td>Commissioning, training, trial material, production interruption and acceptance testing.<\/td>\n<td>Include actual cash cost and planned lost time where material.<\/td>\n<\/tr>\n<tr>\n<td>Working capital<\/td>\n<td>Recommended hooks, seals, filters, hoses and local inventory.<\/td>\n<td>Include initial stock in capital; replenishment belongs in annual O&amp;M.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"para\">Do not reduce the project cost to make the payback look attractive. If a lifting aid is necessary to achieve the one-operator cycle in the proposed spreadsheet, it belongs in the investment. Otherwise, the ROI model is using a work method that the project has not purchased.<\/div>\n<\/div>\n<div id=\"labor\">\n<h2>5. Measure Labor by the Complete Process, Not by Cylinder Time<\/h2>\n<div class=\"para\">YUXI publicly describes its <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/tire-recycling-equipment\/tire-wire-drawing-machine\/\" target=\"_blank\">trefiladora de neum\u00e1ticos<\/a> as a hydraulic double-hook debeader used on prepared radial tire bead rings before cutting, shredding or rubber-powder production. The page identifies manual loading with hydraulic pulling and says the exact configuration depends on tire diameter, bead structure and layout.<sup><a href=\"#ref-yuxi\">1<\/a><\/sup><\/div>\n<div class=\"para\">That means labor does not disappear when the cylinder is powered. Someone still presents the correct ring, positions it, initiates the approved cycle, clears the rubber-rich output, controls the extracted steel and resets the area.<\/div>\n<div class=\"formula\"><code>Labor cost per accepted ring = operator count \u00d7 full-cycle minutes \u00f7 60 \u00d7 loaded labor cost per hour<\/code><\/div>\n<div class=\"para\">Use loaded labor cost, not only the hourly wage. In March 2026, the U.S. Bureau of Labor Statistics reported average private-industry manufacturing costs of $32.20 per hour for wages and salaries plus $16.07 for benefits, or $48.27 combined.<sup><a href=\"#ref-bls\">4<\/a><\/sup> That national figure is not the correct rate for every plant. It is a useful reminder that payroll tax, paid leave, insurance and other benefits can materially change the ROI.<\/div>\n<h3>Start and stop the timer in the same place<\/h3>\n<table>\n<thead>\n<tr>\n<th>L\u00edmite temporal<\/th>\n<th>Include<\/th>\n<th>Por qu\u00e9 es importante<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Start<\/td>\n<td>Operator begins handling the next unprocessed ring from the defined staging point.<\/td>\n<td>Pre-positioning tires off-camera can hide substantial labor.<\/td>\n<\/tr>\n<tr>\n<td>Active cycle<\/td>\n<td>Loading, restraint, hook engagement, pulling, return and approved control sequence.<\/td>\n<td>Shows the machine-dependent portion.<\/td>\n<\/tr>\n<tr>\n<td>Compensaci\u00f3n de salidas<\/td>\n<td>Remove and place the rubber ring and steel bundle in their defined destinations.<\/td>\n<td>Wire release and bin condition can dominate the cycle.<\/td>\n<\/tr>\n<tr>\n<td>Stop<\/td>\n<td>Cell is ready to receive the next ring.<\/td>\n<td>Prevents the test from ending before housekeeping and reset.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"para\">En <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/how-does-a-tire-wire-drawing-machine-work\/\" target=\"_blank\">Gu\u00eda sobre el principio de funcionamiento<\/a> explains the complete locate\u2013engage\u2013pull\u2013separate\u2013reset cycle. For ROI, that sequence should be timed over consecutive rings, not edited into one successful stroke.<\/div>\n<h3>Separate machine time from labor time<\/h3>\n<div class=\"para\">Two operators may work in parallel: one clears steel while the other stages the next ring. In that case, elapsed cycle time and labor-minutes are different. The machine may complete one accepted ring every 60 seconds while consuming 90 labor-seconds because tasks overlap. Use both numbers. Capacity planning needs elapsed time; ROI needs labor time.<\/div>\n<\/div>\n<div id=\"wear\">\n<h2>6. Turn Blade-Wear and Downtime Claims Into Evidence<\/h2>\n<div class=\"para\">\u201cProtects shredder blades\u201d is commercially attractive language, but it is too broad for a purchase order. The blade-wear calculation needs a cause, a baseline and a normalization method.<\/div>\n<h3>Build a wear ledger<\/h3>\n<ul class=\"check\">\n<li>date and operating hours at each inspection, rotation, sharpening or replacement;<\/li>\n<li>tire family and approximate tonnage or ring count processed in the period;<\/li>\n<li>failed component and observed wear mode\u2014normal edge rounding, chipping, fracture, wrapping damage or another cause;<\/li>\n<li>parts cost, service labor and external machining cost;<\/li>\n<li>line downtime from safe shutdown through restart;<\/li>\n<li>whether concentrated bead wire was found at the event;<\/li>\n<li>other variables such as foreign metal, feeding shock, alignment or poor maintenance.<\/li>\n<\/ul>\n<div class=\"formula\"><code>Avoided annual wear cost = normalized baseline blade\/cutter cost \u2212 normalized post-installation blade\/cutter cost<\/code><\/div>\n<div class=\"para\">Normalize the comparison by a useful production denominator: cost per ton, cost per thousand accepted rings, or cost per productive hour. Calendar months alone are weak when one period processed mostly passenger tires and the other processed heavy truck rings.<\/div>\n<h3>Value downtime conservatively<\/h3>\n<div class=\"formula\"><code>Avoided downtime value = avoided bead-related stop hours \u00d7 contribution value of the constrained line hour<\/code><\/div>\n<div class=\"para\">The constrained-line hour is not normally equal to gross sales divided by operating hours. Use a defensible contribution value: additional saleable output less variable cost, avoided overtime, avoided outside processing, or another plant-approved measure. If downstream demand is already saturated, a faster line may produce no extra economic value.<\/div>\n<div class=\"para\">A <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/tire-recycling-equipment\/tire-shredder-machine\/\" target=\"_blank\">trituradora de neum\u00e1ticos<\/a> is only one part of the process, so identify which machine actually constrains production. Saving ten minutes at a non-bottleneck machine may improve housekeeping without increasing saleable output.<\/div>\n<\/div>\n<div id=\"steel-quality\">\n<h2>7. Count Recovered Steel and Output Quality Without Double Counting<\/h2>\n<div class=\"para\">A successful extraction creates a concentrated bead-wire bundle and a rubber-rich ring. The wire may have scrap value, but the contribution depends on realized local price, rubber contamination, storage, loading and transport. Use settlement records or written buyer terms rather than an online headline price.<\/div>\n<div class=\"formula\"><code>Net bead-steel contribution = saleable bead-wire mass \u00d7 realized net price \u2212 extra sorting, storage and transport cost<\/code><\/div>\n<div class=\"para\">Do not count all tire steel as debeader output. Steel belts and other reinforcement can remain in the tire body. EPA\u2019s description of tire-crumb production notes that the process removes 99 percent or more of steel and fabric overall and uses magnets throughout the reduction process to remove wire and other metal contaminants.<sup><a href=\"#ref-epa\">3<\/a><\/sup> A front-end debeader removes the concentrated bead package; downstream liberation and magnetic separation still have work to do.<\/div>\n<h3>Output quality can be valuable even when throughput does not change<\/h3>\n<div class=\"para\">For some plants, the benefit appears as fewer exposed wires in intermediate chips, less rework, more stable magnetic separation or a more consistent feed to granulation. Translate that into an existing cost or specification: rejected loads, labor spent picking wire, separator recirculation, customer complaints or production held for inspection. Avoid creating a vague \u201cquality improvement\u201d line worth whatever amount is needed to reach the desired payback.<\/div>\n<\/div>\n<div id=\"formulas\">\n<h2>8. Tire Debeader ROI, Payback and Break-Even Formulas<\/h2>\n<h3>Annual net benefit<\/h3>\n<div class=\"formula\"><code>Annual net benefit = labor change + avoided wear + avoided downtime + net steel contribution + usable throughput\/quality contribution \u2212 added annual O&amp;M<\/code><\/div>\n<h3>Per\u00edodo de recuperaci\u00f3n simple<\/h3>\n<div class=\"formula\"><code>Payback years = total installed project cost \u00f7 annual net benefit<\/code><\/div>\n<div class=\"para\">When annual net benefit is zero or negative, simple payback does not exist. That is a valid answer. It means the current assumptions do not justify the project.<\/div>\n<h3>Simple annual return<\/h3>\n<div class=\"formula\"><code>Simple annual return = annual net benefit \u00f7 total installed project cost \u00d7 100%<\/code><\/div>\n<div class=\"para\">This is not an accounting rate of return or a discounted cash-flow model. Larger projects should add tax treatment, depreciation, financing, residual value, inflation, downtime during implementation and the company\u2019s required discount rate.<\/div>\n<h3>Break-even production volume<\/h3>\n<div class=\"formula\"><code>Break-even accepted rings per year = annual fixed ownership cost \u00f7 net benefit per accepted ring<\/code><\/div>\n<div class=\"para\">The per-ring method is useful when the plant\u2019s volume is uncertain. It also exposes a common problem: the machine may have an attractive contribution per ring but insufficient annual feed to recover the fixed cost.<\/div>\n<\/div>\n<div id=\"example\">\n<h2>9. Illustrative Payback Example\u2014Not a YUXI Quote or Guarantee<\/h2>\n<div class=\"para\">The following numbers exist only to show how the worksheet behaves. They are not YUXI price, capacity, labor-saving or blade-life claims.<\/div>\n<table>\n<thead>\n<tr>\n<th>Input<\/th>\n<th>Illustrative value<\/th>\n<th>Calculation note<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Total installed project cost<\/td>\n<td>US$38,000<\/td>\n<td>Machine, logistics, site work, guarding interface, handling aid and start-up spares.<\/td>\n<\/tr>\n<tr>\n<td>Accepted prepared rings per year<\/td>\n<td>25,000<\/td>\n<td>Normal production volume, not supplier rated capacity.<\/td>\n<\/tr>\n<tr>\n<td>Current labor cost per ring<\/td>\n<td>US$1.46<\/td>\n<td>Two people \u00d7 1.25 minutes \u00f7 60 \u00d7 US$35 loaded labor rate.<\/td>\n<\/tr>\n<tr>\n<td>Proposed labor cost per ring<\/td>\n<td>US$0.63<\/td>\n<td>One person \u00d7 1.08 minutes \u00f7 60 \u00d7 US$35; must be proven with the proposed handling aid.<\/td>\n<\/tr>\n<tr>\n<td>Annual labor benefit<\/td>\n<td>US$20,750<\/td>\n<td>(1.46 \u2212 0.63) \u00d7 25,000 rings.<\/td>\n<\/tr>\n<tr>\n<td>Avoided wear and service<\/td>\n<td>US$5,000<\/td>\n<td>Plant estimate supported by normalized maintenance records.<\/td>\n<\/tr>\n<tr>\n<td>Avoided bead-related downtime<\/td>\n<td>US$3,000<\/td>\n<td>Plant-approved constrained-hour contribution.<\/td>\n<\/tr>\n<tr>\n<td>Net bead-steel contribution<\/td>\n<td>US$1,500<\/td>\n<td>Realized price after handling and contamination deductions.<\/td>\n<\/tr>\n<tr>\n<td>Added power, hooks and maintenance<\/td>\n<td>\u2212US$4,500<\/td>\n<td>Annual operating cost of the new step.<\/td>\n<\/tr>\n<tr>\n<td><strong>Annual net benefit<\/strong><\/td>\n<td><strong>US$25,750<\/strong><\/td>\n<td>20,750 + 5,000 + 3,000 + 1,500 \u2212 4,500.<\/td>\n<\/tr>\n<tr>\n<td><strong>Amortizaci\u00f3n simple<\/strong><\/td>\n<td><strong>1.48 years \/ 17.7 months<\/strong><\/td>\n<td>38,000 \u00f7 25,750.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"para\">Now change one assumption. Suppose the plant currently feeds rings directly to the shredder, so the debeader adds US$0.63 of labor per ring instead of saving US$0.83. Annual labor change becomes negative US$15,750. With the other benefits unchanged, the project loses US$10,750 per year before financing and does not pay back. The same machine can therefore be financially attractive in one process and unattractive in another.<\/div>\n<div class=\"note\">\n<div class=\"para\"><strong>Sensitivity check:<\/strong> run the model at low, expected and high annual volume; at conservative and observed wear savings; and with the hardest normal tire mix. A payback that disappears after a 15 percent change in volume or labor should be treated as a fragile case.<\/div>\n<\/div>\n<\/div>\n<div id=\"not-worth-it\">\n<h2>10. When a Tire Debeader May Not Be Worth It<\/h2>\n<div class=\"para\">Sometimes the right recommendation is to postpone the purchase. That is not a failure of the ROI process. It prevents a machine from becoming an isolated island in the workshop.<\/div>\n<table>\n<thead>\n<tr>\n<th>Estado<\/th>\n<th>Why the ROI may be weak<\/th>\n<th>Better next step<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Low annual compatible volume<\/td>\n<td>Fixed cost is spread over too few accepted rings.<\/td>\n<td>Calculate break-even volume and consider batch processing or outside service.<\/td>\n<\/tr>\n<tr>\n<td>Feed state is not defined<\/td>\n<td>The plant may need an additional cutter or preparation process before the debeader can work.<\/td>\n<td>Map the actual incoming tire and confirm the approved prepared ring.<\/td>\n<\/tr>\n<tr>\n<td>No measured wear problem<\/td>\n<td>Blade savings are speculative, so the project may rely on a benefit that does not exist.<\/td>\n<td>Start maintenance and stop-cause logging before purchase.<\/td>\n<\/tr>\n<tr>\n<td>Downstream output is already capped by demand<\/td>\n<td>Higher machine availability may not create additional saleable product.<\/td>\n<td>Value only avoided cost, not unused production capacity.<\/td>\n<\/tr>\n<tr>\n<td>Mixed truck and OTR tires are treated as one class<\/td>\n<td>Handling and equipment scope can change substantially.<\/td>\n<td>Separate standard truck evidence from OTR engineering and testing.<\/td>\n<\/tr>\n<tr>\n<td>Layout creates extra travel and wire handling<\/td>\n<td>The new cell adds labor and cross-traffic that erase the mechanical advantage.<\/td>\n<td>Redesign staging, lifting, discharge and buffer positions before ordering.<\/td>\n<\/tr>\n<tr>\n<td>The plant expects all steel to disappear<\/td>\n<td>Steel belts remain and downstream separation is still required.<\/td>\n<td>Define the output of every stage and the final steel specification.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div id=\"trial\">\n<h2>11. Prove the Business Case With a Representative-Tire Trial<\/h2>\n<div class=\"para\">A working video is useful, but the ROI test should be planned like a small production study. The <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/how-to-choose-a-tire-debeader-machine\/\" target=\"_blank\">selection guide<\/a> recommends validation on the largest and most difficult normal tire. For payback, add enough consecutive cycles to measure labor and output handling.<\/div>\n<h3>Trial sample plan<\/h3>\n<ul class=\"check\">\n<li>common passenger or light-truck ring, if it is a meaningful part of the mix;<\/li>\n<li>common bus or truck ring;<\/li>\n<li>largest normal ring;<\/li>\n<li>most difficult normal bead construction or preparation condition;<\/li>\n<li>damaged or deformed examples only when they are ordinary production, not rare exceptions;<\/li>\n<li>separate OTR samples when OTR is an explicit, engineered requirement.<\/li>\n<\/ul>\n<h3>Record more than accepted rings per hour<\/h3>\n<table>\n<thead>\n<tr>\n<th>Trial field<\/th>\n<th>R\u00e9cord<\/th>\n<th>Use in ROI<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Full-cycle elapsed time<\/td>\n<td>Pickup, load, position, extract, clear and reset.<\/td>\n<td>Capacity and line-balance model.<\/td>\n<\/tr>\n<tr>\n<td>Labor-seconds<\/td>\n<td>Every operator\u2019s active time, including overlapping tasks.<\/td>\n<td>Labor cost per accepted ring.<\/td>\n<\/tr>\n<tr>\n<td>First-pass acceptance<\/td>\n<td>Complete acceptable extraction without re-engagement.<\/td>\n<td>Rework and sustainable-output assumption.<\/td>\n<\/tr>\n<tr>\n<td>Output handling<\/td>\n<td>Wire shape, rubber attachment, bin fill and clearing method.<\/td>\n<td>Steel value, housekeeping and labor.<\/td>\n<\/tr>\n<tr>\n<td>Sucesos an\u00f3malos<\/td>\n<td>Slip, incomplete pull, wire release problem, leakage or stop.<\/td>\n<td>Maintenance and production risk.<\/td>\n<\/tr>\n<tr>\n<td>Downstream comparison<\/td>\n<td>Shredder load, stop causes, cutter inspection and separation result.<\/td>\n<td>Wear, downtime and quality benefits.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"para\">Hook count alone is not a productivity multiplier. The <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/single-hook-vs-double-hook-tire-debeader\/\" target=\"_blank\">single-hook vs double-hook comparison<\/a> explains why a second hook creates value only when it reduces a real repositioning or engagement bottleneck inside the full cycle.<\/div>\n<\/div>\n<div id=\"yuxi-fit\">\n<h2>12. Where the YUXI Tire Debeader Fits in the ROI Study<\/h2>\n<div class=\"para\">YUXI\u2019s public product information describes a hydraulic double-hook configuration for prepared radial tire bead rings from passenger cars, buses and trucks, depending on size and project configuration. It places the machine before tire cutting, shredding, rubber crushing, rubber-powder production or related pretreatment. It does not publish one universal model, motor power, capacity or payback for every project.<sup><a href=\"#ref-yuxi\">1<\/a><\/sup><\/div>\n<div class=\"para\">That boundary is commercially important. An ROI model should not import a competitor\u2019s cycle rate, pulling force, hook life or price and label it as YUXI performance. Use the <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/tire-wire-drawing-machine-specifications\/\" target=\"_blank\">specification-verification guide<\/a> to turn the final quotation into defined fields, test conditions and evidence.<\/div>\n<h3>Data to send for an ROI-based configuration review<\/h3>\n<ul class=\"check\">\n<li>whole-tire and prepared-ring photos, video and sidewall markings;<\/li>\n<li>minimum, typical and maximum ring dimensions and approximate weight;<\/li>\n<li>annual volume, shift pattern and tire-mix percentages;<\/li>\n<li>current preparation, loading, pulling, shredding and steel-separation route;<\/li>\n<li>current operator count, labor-minutes and loaded labor cost;<\/li>\n<li>twelve months of blade, hook, cutter, service and downtime records where available;<\/li>\n<li>downstream machine, output target and any exposed-wire or cleanliness requirement;<\/li>\n<li>power supply, workshop layout, staging and handling aids;<\/li>\n<li>destination and required commercial delivery scope;<\/li>\n<li>request for a complete-cycle test using representative rings.<\/li>\n<\/ul>\n<div class=\"para\">Truck-tire projects should also separate ordinary commercial truck rings from OTR or mining tires. The <a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/truck-tire-debeader-machine\/\" target=\"_blank\">truck tire debeader guide<\/a> explains the feed, handling and acceptance-test boundary.<\/div>\n<\/div>\n<div id=\"safety\">\n<h2>13. Safety Is a Project Requirement, Not an ROI Credit<\/h2>\n<div class=\"para\">A hydraulic hook machine presents moving, pinch, pull, release and stored-energy hazards. Extracted bead wire can also be sharp and spring-like. The project should not assign a convenient dollar benefit to \u201cimproved safety\u201d and use it to force a positive payback. Instead, define guarding, controls, handling and energy isolation as mandatory conditions of the proposed work method.<\/div>\n<div class=\"para\">OSHA\u2019s general machine-guarding standard requires guarding methods to protect workers from point-of-operation, nip-point, rotating-part and related hazards, and states that an exposed point of operation must be guarded to keep the operator out of the danger zone during the cycle.<sup><a href=\"#ref-osha-guard\">5<\/a><\/sup> OSHA\u2019s hazardous-energy standard also requires stored or residual energy to be relieved, disconnected, restrained or otherwise rendered safe during covered servicing.<sup><a href=\"#ref-osha-loto\">6<\/a><\/sup><\/div>\n<div class=\"source-boundary\">\n<div class=\"para\"><strong>L\u00edmite importante:<\/strong> This article is a purchasing and ROI framework, not a machine-specific risk assessment, operating instruction or lockout procedure. The final method must use the supplier\u2019s documentation, the buyer\u2019s site risk assessment and applicable local requirements.<\/div>\n<\/div>\n<\/div>\n<div id=\"decision\">\n<h2>14. Final Decision Matrix: Buy, Test or Postpone<\/h2>\n<figure>\n<img src=\"https:\/\/yuxi-tirerecycling.com\/wp-content\/uploads\/2026\/07\/tire-debeader-investment-decision-matrix.webp\" width=\"1600\" height=\"900\" loading=\"lazy\" decoding=\"async\" alt=\"Tire debeader investment decision matrix for volume bead difficulty wear output labor and data quality\" title=\"Tire Debeader Investment Decision Matrix\"><figcaption>High signals justify a measured trial. Weak data quality usually means \u201cmeasure first,\u201d not automatically \u201cbuy\u201d or \u201cdo not buy.\u201d<\/figcaption><\/figure>\n<table>\n<thead>\n<tr>\n<th>Decision<\/th>\n<th>Typical evidence<\/th>\n<th>Acci\u00f3n<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Buy after validation<\/td>\n<td>Representative feed confirmed; positive conservative payback; layout and safety method defined; benefits remain positive in sensitivity analysis.<\/td>\n<td>Finalize scope, FAT, installed-cost budget, baseline and post-installation measurement plan.<\/td>\n<\/tr>\n<tr>\n<td>Test first<\/td>\n<td>Volume is adequate but wear attribution, labor method, output handling or truck-tire performance is uncertain.<\/td>\n<td>Run a representative consecutive-cycle test and short downstream comparison.<\/td>\n<\/tr>\n<tr>\n<td>Measure first<\/td>\n<td>No reliable maintenance, downtime or labor records.<\/td>\n<td>Collect baseline data before using a guessed benefit in the purchase case.<\/td>\n<\/tr>\n<tr>\n<td>Postpone or redesign<\/td>\n<td>Low volume, incompatible feed, negative payback, no downstream need or poor work-cell layout.<\/td>\n<td>Change preparation, handling, line design, market route or outsourcing strategy.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"callout\">\n<h2>Build the Quotation Around Your Baseline<\/h2>\n<div class=\"para\">Send YUXI your prepared tire-ring data, annual volume, current labor cycle, downstream blade and downtime history, output requirement, layout and power supply. Request one defined configuration and a complete-cycle test plan. The goal is not the fastest-looking video; it is a payback model that survives real production.<\/div>\n<p><a class=\"cta\" href=\"https:\/\/yuxi-tirerecycling.com\/es\/contact-us\/\" target=\"_blank\">Request a Tire-Specific Configuration Review<\/a>\n<\/div>\n<\/div>\n<div id=\"faq\">\n<h2>Preguntas frecuentes<\/h2>\n<div class=\"faq\">\n<details>\n<summary>Is a tire debeader always worth the investment?<\/summary>\n<div class=\"para\">No. It is most likely to justify itself when the plant processes enough compatible prepared bead rings and can document labor, blade wear, downtime, recovered-steel or output-quality benefits. Low-volume plants or lines with no measured bead-related problem may not recover the installed cost.<\/div>\n<\/details>\n<details>\n<summary>How do I calculate tire debeader payback?<\/summary>\n<div class=\"para\">Calculate annual net benefit from labor change, avoided wear, avoided downtime, net steel contribution and throughput or quality gains, then subtract added power, maintenance, hooks, handling and other operating costs. Divide total installed project cost by annual net benefit to estimate simple payback.<\/div>\n<\/details>\n<details>\n<summary>Does a tire debeader always reduce labor?<\/summary>\n<div class=\"para\">Not always. It can reduce labor when it replaces a slower front-end method, but it can add labor when a plant previously fed bead-containing material directly to the shredder. Measure the complete route, including ring preparation, loading, extraction, unloading and wire handling.<\/div>\n<\/details>\n<details>\n<summary>How should blade-wear savings be measured?<\/summary>\n<div class=\"para\">Use maintenance records for blades or cutters, replacement labor and downtime. Compare normalized periods with similar tire mix and throughput. Do not convert a supplier statement such as \u201cless wear\u201d into a dollar value without a plant baseline or controlled trial.<\/div>\n<\/details>\n<details>\n<summary>\u00bfEl desmontador de neum\u00e1ticos elimina todo el acero del neum\u00e1tico?<\/summary>\n<div class=\"para\">No. A hook-type tire debeader removes the concentrated bead-wire bundle from a compatible prepared ring. Steel belts and other reinforcement can remain and require downstream liberation and magnetic separation.<\/div>\n<\/details>\n<details>\n<summary>When is a tire debeader probably not worth it?<\/summary>\n<div class=\"para\">It may not be justified when annual volume is low, the feed is incompatible or inconsistent, the current shredder has no measured bead-related wear or downtime, the recovered material does not need cleaner front-end separation, or the plant cannot support safe handling and guarding.<\/div>\n<\/details>\n<details>\n<summary>What data should I send YUXI for an ROI-based quotation?<\/summary>\n<div class=\"para\">Send tire photos and markings, prepared feed condition, annual and shift volume, tire-mix percentages, current labor and cycle time, blade and maintenance records, bead-related downtime, downstream equipment, local power, site layout and destination. Ask for a complete-cycle test using representative rings.<\/div>\n<\/details>\n<\/div>\n<\/div>\n<div id=\"references\">\n<h2>Referencias y notas bibliogr\u00e1ficas<\/h2>\n<ol class=\"ref\">\n<li id=\"ref-handbook\"><a href=\"https:\/\/www.ustires.org\/sites\/default\/files\/EPA_Scrap_Tire_Handbook_on_Recycling_Management.pdf\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">U.S. EPA \/ U.S. Tire Manufacturers Association \u2014 Scrap Tires: Handbook on Recycling Applications and Management<\/a>. Glossary definition states that bead-wire removal before shredding allows a cleaner end product and less wear on moving shredder parts.<\/li>\n<li id=\"ref-epa\"><a href=\"https:\/\/www.epa.gov\/chemical-research\/tire-crumb-questions-and-answers\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">U.S. EPA \u2014 Tire Crumb Questions and Answers<\/a>. Used to explain that tire-crumb production removes steel and fabric through multiple reduction and separation stages, including magnets.<\/li>\n<li id=\"ref-bls\"><a href=\"https:\/\/www.bls.gov\/charts\/employer-costs-for-employee-compensation\/costs-by-industry.htm\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">U.S. Bureau of Labor Statistics \u2014 Employer Costs for Employee Compensation by Industry, March 2026<\/a>. Used only as a U.S. loaded-labor benchmark; each plant should use its own cost.<\/li>\n<li id=\"ref-osha-guard\"><a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1910\/1910.212\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">OSHA \u2014 29 CFR 1910.212, General Requirements for All Machines<\/a>. Used for the general machine-guarding boundary.<\/li>\n<li id=\"ref-osha-loto\"><a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1910\/1910.147\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">OSHA \u2014 29 CFR 1910.147, Control of Hazardous Energy<\/a>. Used for stored-energy and servicing boundary.<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<style>\r\n.lwrp.link-whisper-related-posts{\r\n            \r\n            margin-top: 40px;\nmargin-bottom: 30px;\r\n        }\r\n        .lwrp .lwrp-title{\r\n            \r\n            \r\n        }.lwrp .lwrp-description{\r\n            \r\n            \r\n\r\n        }\r\n        .lwrp .lwrp-list-container{\r\n        }\r\n        .lwrp .lwrp-list-multi-container{\r\n            display: flex;\r\n        }\r\n        .lwrp .lwrp-list-double{\r\n            width: 48%;\r\n        }\r\n        .lwrp .lwrp-list-triple{\r\n            width: 32%;\r\n        }\r\n        .lwrp .lwrp-list-row-container{\r\n            display: flex;\r\n            justify-content: space-between;\r\n        }\r\n        .lwrp .lwrp-list-row-container .lwrp-list-item{\r\n            width: calc(25% - 20px);\r\n        }\r\n        .lwrp .lwrp-list-item:not(.lwrp-no-posts-message-item){\r\n            \r\n            \r\n        }\r\n        .lwrp .lwrp-list-item img{\r\n            max-width: 100%;\r\n            height: auto;\r\n            object-fit: cover;\r\n            aspect-ratio: 1 \/ 1;\r\n        }\r\n        .lwrp .lwrp-list-item.lwrp-empty-list-item{\r\n            background: initial !important;\r\n        }\r\n        .lwrp .lwrp-list-item .lwrp-list-link .lwrp-list-link-title-text,\r\n        .lwrp .lwrp-list-item .lwrp-list-no-posts-message{\r\n            \r\n            \r\n            \r\n            \r\n        }@media screen and (max-width: 480px) {\r\n            .lwrp.link-whisper-related-posts{\r\n                \r\n                \r\n            }\r\n            .lwrp .lwrp-title{\r\n                \r\n                \r\n            }.lwrp .lwrp-description{\r\n                \r\n                \r\n            }\r\n            .lwrp .lwrp-list-multi-container{\r\n                flex-direction: column;\r\n            }\r\n            .lwrp .lwrp-list-multi-container ul.lwrp-list{\r\n                margin-top: 0px;\r\n                margin-bottom: 0px;\r\n                padding-top: 0px;\r\n                padding-bottom: 0px;\r\n            }\r\n            .lwrp .lwrp-list-double,\r\n            .lwrp .lwrp-list-triple{\r\n                width: 100%;\r\n            }\r\n            .lwrp .lwrp-list-row-container{\r\n                justify-content: initial;\r\n                flex-direction: column;\r\n            }\r\n            .lwrp .lwrp-list-row-container .lwrp-list-item{\r\n                width: 100%;\r\n            }\r\n            .lwrp .lwrp-list-item:not(.lwrp-no-posts-message-item){\r\n                \r\n                \r\n            }\r\n            .lwrp .lwrp-list-item .lwrp-list-link .lwrp-list-link-title-text,\r\n            .lwrp .lwrp-list-item .lwrp-list-no-posts-message{\r\n                \r\n                \r\n                \r\n                \r\n            };\r\n        }<\/style>\r\n<div id=\"link-whisper-related-posts-widget\" class=\"link-whisper-related-posts lwrp\">\r\n            <div class=\"lwrp-title\">Entradas relacionadas<\/div>    \r\n        <div class=\"lwrp-list-container\">\r\n                                            <div class=\"lwrp-list-multi-container\">\r\n                    <ul class=\"lwrp-list lwrp-list-double lwrp-list-left\">\r\n                        <li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/tire-shredder-machine-price-guide\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Gu\u00eda de precios de las trituradoras de neum\u00e1ticos<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/tire-sidewall-cutter-vs-manual-tire-cutting\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Cortador de flancos de neum\u00e1ticos frente al corte manual de neum\u00e1ticos<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/truck-tire-debeader-machine\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Gu\u00eda sobre la m\u00e1quina para desmontar neum\u00e1ticos de cami\u00f3n<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/tire-shredder-vs-tire-crusher\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Trituradora de neum\u00e1ticos frente a trituradora de neum\u00e1ticos: diferencias clave<\/span><\/a><\/li>                    <\/ul>\r\n                    <ul class=\"lwrp-list lwrp-list-double lwrp-list-right\">\r\n                        <li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/single-hook-vs-double-hook-tire-debeader\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Desmontadora de neum\u00e1ticos de gancho simple frente a desmontadora de neum\u00e1ticos de gancho doble<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/how-does-a-tire-shredder-machine-work\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">\u00bfC\u00f3mo funciona una trituradora de neum\u00e1ticos?<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/blog\/whole-tire-shredder-machine-guide\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">Gu\u00eda sobre las m\u00e1quinas trituradoras de neum\u00e1ticos enteros<\/span><\/a><\/li><li class=\"lwrp-list-item\"><a href=\"https:\/\/yuxi-tirerecycling.com\/es\/tire-recycling-equipment\/tire-cutting-machine\/\" class=\"lwrp-list-link\"><span class=\"lwrp-list-link-title-text\">M\u00e1quina cortadora de neum\u00e1ticos<\/span><\/a><\/li>                    <\/ul>\r\n                <\/div>\r\n                        <\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Calculate tire debeader ROI from labor, shredder blade wear, downtime, recovered steel and installed cost\u2014without relying on a generic payback claim.<\/p>","protected":false},"author":2,"featured_media":921,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[6,15],"tags":[],"class_list":["post-925","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-tire-wire-drawing-blogs"],"_links":{"self":[{"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/posts\/925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/comments?post=925"}],"version-history":[{"count":0,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/posts\/925\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/media\/921"}],"wp:attachment":[{"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/media?parent=925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/categories?post=925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yuxi-tirerecycling.com\/es\/wp-json\/wp\/v2\/tags?post=925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}